Posted On:4 Dec, 2016

UGTE successfully the supply and installation of HDPE Pre Insulated Pipe, fittings and accessories for a chilled water line at a prestigious school in Dubai.  The UGTE site teams carried out both the butt fusion joints as well as field joints on site.